Stop drowning in
correction letters.
ClearStamp reads your blueprints, researches the code, and writes your response — in minutes, not weeks.
Avg. response time
Code accuracy rate
GA jurisdictions
Smith ADU Addition
City of Atlanta
Response Package Ready
3 files • 12 pages • 47 code citations
The old way vs. the ClearStamp way
Average correction response: 2–4 weeks. With ClearStamp: 15 minutes.
2–4 weeks average turnaround
~15 minutes average turnaround
Three steps to cleared permits
Upload
Drop your blueprints and correction letter. Any PDF format. We handle the rest.
AI Analyzes
12 specialized AI agents review your blueprints, research codes, and draft responses simultaneously.
Download
Get a professional response letter, scope document, and detailed analysis — ready to submit.
Built for the way you work
Blueprint AI Vision
Our AI reads architectural, structural, MEP, and site plans — identifying elements, dimensions, and compliance issues.
Building Code Knowledge
Complete 2024 ICC codes with Georgia amendments and Atlanta local requirements. Always current.
Multi-Agent Review
12 specialized AI agents work in parallel — structural, plumbing, electrical, fire, energy, and zoning.
Response Letters
Professional, formatted response letters with code citations that city reviewers expect to see.
Professional Scope
Automatically identifies items requiring a licensed architect or engineer and generates a scope document.
Live Processing
Watch your project progress in real-time as each agent completes its review. Full transparency.
Simple, transparent pricing
Pay per project or save with a monthly plan
Single Review
- Up to 15 correction items
- 1 response letter
- 1 professional scope doc
- Email support
Pro Review
- Up to 50 correction items
- Response letter + scope
- 2 revision cycles
- Priority processing
Monthly Unlimited
- Unlimited projects
- Priority processing
- Dedicated support
- API access
Enterprise
- Bulk pricing
- White-label option
- City portal integration
- Custom workflows
Trusted by builders across Atlanta
“ClearStamp saved us two weeks on our last ADU project. The correction response was more thorough than what our architect produced.”
Marcus T.
General Contractor, Atlanta
“I was skeptical about AI reading blueprints, but the code citations were spot-on. My city reviewer approved the response on the first round.”
Lisa K.
Permit Expediter, DeKalb County
“We process 30+ correction responses a month. ClearStamp cut our response time by 80% and our costs by half.”
David R.
Architecture Firm Owner, Sandy Springs
Frequently asked questions
Ready to clear your next permit?
Join the waitlist for early access. First project is on us.
Get Started Free